OHS Risk Analysis - What does the 'Risk Rating' refer to? Total or Residual?
In a quantitative OHS Risk Analysis, what does 'Risk rating' refer to? what I mean to ask is if the calculated rating refers to the Total Score for that Risk or it is the RESIDUAL Risk i.e. the risk left after applying certain controls.

If it is assumed that it refers to the Total Score of the Risk under question (irrespective of the applied controls), what does it still mean ? If the score is high and as such the Risk classifies itself as Significant, does it still warrant 'ADDITIONAL CONTROLS' despite the fact that adequate controls are already in place.

Please help to let me learn when to consider a significant hazard for action based on its Risk Rating?

Thanks in advance & best regards,

الردود

Randy (http://elsmar.com/Forums/member.php?u=371) http://elsmar.com/Forums/images/statusicon/user_offline.gif
Super Moderator

Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
Posts: 5,956
Thanks Given to Others: 31
Thanked 1,111 Times in 721 Posts
Karma Power: 371 Karma: 10506
http://elsmar.com/Forums/images/reputation/reputation_bronzestar.gifhttp://elsmar.com/Forums/images/reputation/reputation_bronzestar.gifhttp://elsmar.com/Forums/images/reputation/reputation_bronzestar.gif
http://elsmar.com/Forums/images/reputation/reputation_green.gifhttp://elsmar.com/Forums/images/reputation/reputation_green.gifhttp://elsmar.com/Forums/images/reputation/reputation_green.gifhttp://elsmar.com/Forums/images/reputation/reputation_green.gifhttp://elsmar.com/Forums/images/reputation/reputation_green.gifhttp://elsmar.com/Forums/images/reputation/reputation_greenh.gifhttp://elsmar.com/Forums/images/reputation/reputation_greenh.gifhttp://elsmar.com/Forums/images/reputation/reputation_greenh.gifhttp://elsmar.com/Forums/images/reputation/reputation_greenh.gifhttp://elsmar.com/Forums/images/reputation/reputation_greenh.gifhttp://elsmar.com/Forums/images/reputation/reputation_gold.gif
http://mystatus.skype.com/smallicon/rldaily (http://elsmar.com/Forums/showthread.php?t=32973#)

http://elsmar.com/Forums/images/icons/icon23.gif Re: What does the 'Risk Rating' refer to ? Total or Residual ?
Excellant question..........

Initially when you do your assessment you are told to take current controls into consideration as well as the hazards you identify...this gives you initial risk.

Upon eliminating/reducing hazards (using the prescribed heirachy) or creating/modifying controls, or a little of both you wind up with the residual risk....this is the risk you will operate under

In all cases levels of tolerability/acceptability must be established

Hopefully you move from higher to lower risk with either controls or hazard elimination/reduction

رد أخر على السؤال
Thank you Sir. This means, during the implementation & operational phase, one has to concentrate much on the 'Residual Risk' and should apply whatever controls needed to bring the Risk under Acceptable level (to be decided by oneself).

This makes things a bit clear and as such, wouldn't it be better to first calculate the total risk that a particular hazard poses assuming total absence of Controls.

Let's put 2 more columns in our table one referring to ' Existing Controls' and another for the remaining or Residual Risk which we still need to control if it is Significant.

Now if we put some additional controls, let its credentials be subtracted from the Residual Risk so as to make all known that this hazard now poses no any risk.

Some more thoughts please...

Best regards, .

للإطلاع على الموضوع كامل اليكم الرابط
http://elsmar.com/Forums/showthread.php?t=32973

حقيقة سؤال غاية فى الأهمية وانا عن نفسى كنت نفسى أجد رد مثل الذى المكتوب

حبيبة السماء
28-08-2009, 11:22 AM
رائع ............جزاكم الله خيرا